Project overview
Who?
National carwash client
Where?
Greenwood Village, CO
When?
2023
How big?
120' Express Tunnel
cobblestone carwash
One of dozens of carwash projects, our team has completed. This express carwash project demonstrated our specialized construction expertise and commitment to delivering high-quality, efficient facilities on time and within budget. From site preparation to final commissioning, every phase was carefully managed to meet the unique demands of a fast-paced, high-volume operation.
The project began with comprehensive civil site improvements, including precise grading and drainage systems designed to manage significant water runoff and meet strict environmental regulations. We installed advanced stormwater management features like retention basins and oil-water separators, robust underground utilities supporting high-capacity water supply, reclaimed water systems, and sanitary sewer connections sized for peak demand and future growth. Durable paving, reinforced concrete aprons, and ADA-compliant curb and sidewalk improvements created a safe, accessible environment.
The project began with comprehensive civil site improvements, including precise grading and drainage systems designed to manage significant water runoff and meet strict environmental regulations. We installed advanced stormwater management features like retention basins and oil-water separators, robust underground utilities supporting high-capacity water supply, reclaimed water systems, and sanitary sewer connections sized for peak demand and future growth. Durable paving, reinforced concrete aprons, and ADA-compliant curb and sidewalk improvements created a safe, accessible environment.
Our mechanical, electrical, and plumbing teams installed and integrated complex systems such as high-pressure pumps, automated conveyors, chemical dispensers, and advanced drying equipment. Electrical work included controls, lighting, and safety systems to power and protect the facility, while plumbing infrastructure supported sustainable water supply, drainage, and reclamation. Close coordination ensured all MEP components functioned seamlessly for maximum reliability.
Throughout construction, we maintained strict adherence to schedule and budget through meticulous planning, proactive communication, and regular coordination. Milestones were aligned to minimize downtime, and ongoing budget reviews helped control costs without sacrificing quality. This disciplined approach allowed us to deliver a fully operational express carwash on time and within budget, ready to meet client needs and customer demand.
This project highlights our ability to manage complex, fast-track construction with technical precision and teamwork, delivering durable, high-performance facilities built to last.